Hydromechanical Equipment & Water Control Solutions for Global Projects

PROJECT CASE STUDY

Gate and Hoist Equipment for Nam Vela Hydropower Station

 FUDA supplied radial gates, gate hoists, and trash racks for the Nam Vela Hydropower Station in northern Laos. Explore the equipment scope, technical specifications, and delivery highlights of this project.

The Project

Project Overview

Located in northern Laos, Nam Vela Hydropower Station includes a reservoir, spillway, and intake structures that support water management for power generation. The project called for equipment to control water releases, operate gates, and protect the intake from floating debris.

FUDA supplied radial gates, gate hoists, and trash racks for the station. Together, these components address flow control, gate operation, and intake protection across the project’s water-control structures.

Engineering Context

Project Requirements

The station’s spillway and intake presented three connected water-control requirements. Each influenced the selection and arrangement of the equipment supplied for the project.

Spillway Flow Control

The spillway required gates that could support controlled water releases as reservoir levels changed.

Gate Operation & Maintenance

The gates needed suitable hoisting equipment and practical access for inspection and maintenance.

Intake Debris Protection

The water intake needed protection from floating debris, with access for regular cleaning.

FUDA’s Contribution

Equipment Supplied for the Project

FUDA supplied a coordinated equipment package for the spillway and water intake, covering gate structures, gate operation, and intake debris protection.

Representative radial gate equipment for a hydropower spillway
Application: Spillway

Radial Gates

Radial gates form the primary flow-control equipment at the spillway. They provide a controlled path for releasing water from the reservoir as operating conditions change.

Representative winch gate hoist equipment
Application: Spillway Gates

Winch Gate Hoists

Winch gate hoists provide the lifting equipment needed to operate the spillway gates. Their role is to support gate opening and closing during normal operation and maintenance.

Representative trash rack equipment for a hydropower water intake
Application: Water Intake

Trash Racks

Trash racks provide a protective barrier at the water intake, helping limit debris entering the waterway while allowing access for routine cleaning.

Project Specifications

Technical Data

Selected specifications for the gates, hoists, and intake protection equipment in the Nam Vela Hydropower Station water-control package.

01 / GATE SYSTEM

Radial Gates

Gate Type

Radial Gate

Opening (W × H)

12 m × 8 m

Design Head

10 m

Quantity

6 sets

02 / HOIST SYSTEM

Winch Hoists

Hoist Type

Electric Winch

Lifting Capacity

2 × 500 kN per gate

Drive System

Electric

Quantity

6 sets

03 / INTAKE PROTECTION

Trash Racks

Installation

Water Intake

Rack Size (W × H)

4 m × 6 m

Bar Spacing

80 mm

Quantity

4 panels

Project Execution

Engineering & Delivery

The Nam Vela equipment package required coordination across the spillway gates, hoists, and water-intake protection. The following stages show how the equipment moved from project requirements toward delivery.

  1. Equipment Coordination

    Gate openings, hoist arrangements, and intake-rack interfaces were reviewed together so the supplied components matched their intended locations within the project.

  2. Fabrication & Inspection

    Gate, hoist, and trash-rack components were fabricated and checked against the agreed equipment drawings before packing and dispatch.

  3. Delivery & Site Support

    The equipment was prepared for shipment with documentation for on-site handling. FUDA coordinated technical questions during the project handover.

Delivery Status

Project Outcome

FUDA completed the supply of radial gates, winch gate hoists, and trash racks for Nam Vela Hydropower Station. The equipment package and supporting technical documents were handed over for integration at the spillway and water intake.

Delivery Summary

Equipment Supplied
Radial Gates, Winch Gate Hoists, Trash Racks
Delivery Milestone
Equipment and technical documents handed over
Project Application
Spillway water control and intake protection
Scroll to Top

PROJECT INQUIRY

Discuss Your Water Control Project

Tell us about your project and equipment requirements. Share available specifications or drawings to help us understand your needs.

  • Gate & Hoist Selection

    Discuss equipment options for your application.

  • Specifications & Customization

    Share dimensions, operating conditions, and technical requirements.

  • New Projects & Replacement

    Tell us about your new installation or existing equipment.

Have drawings or specifications?

Attach them to your inquiry. If details are still being developed, start with a brief project description.

Tell Us What You Need

Share your project details so we can better understand your requirements.

FUDA Form