Hydromechanical Equipment & Water Control Solutions for Global Projects

OUR PRODUCT RANGE

Water Control Equipment

Explore Fuda’s water control gates, gate hoists and trash handling equipment for hydropower stations, reservoirs and water infrastructure projects.

Steel water control gate

Water Control Gates

Steel gates for flow regulation, water isolation and maintenance access across dams, waterways and hydraulic structures.

  • Radial Gates
  • Sluice Gates
  • Bulkhead Gates
Gate hoisting equipment

Gate Hoists

Hoisting equipment for opening, closing and positioning gates, with configurations selected to suit gate loads and operating requirements.

  • Winch Hoists
  • Hydraulic Hoists
  • Screw Hoists
Trash rack cleaning equipment

Trash Racks & Cleaners

Equipment for intercepting and removing debris at water intakes, helping maintain flow and protect downstream equipment.

  • Trash Racks
  • Grab Bucket Cleaners
Gate hoisting equipment at Fuda

ENGINEERING & MANUFACTURING CAPABILITIES

Why Choose Fuda

Fuda combines multidisciplinary engineering, manufacturing resources and quality control to deliver customized hydromechanical steel structures for water infrastructure projects worldwide.

  • Certifications & Patents

    ISO 9001, ISO 14001 and ISO 45001 management systems, CE and classification society certifications, plus 100+ patent certificates and multiple inventions.

  • Multidisciplinary Engineering

    A 30+ member technical team covering mechanical, hydraulic, electromechanical, automation control and software disciplines develops customized solutions for your project.

  • Manufacturing Capacity

    A 50,000 m² facility and 165 employees support the fabrication and assembly of steel gates, gate hoists and associated hydromechanical steel structures.

  • Quality Control & Testing

    Quality control includes weld inspection, coating inspection, winch hoist testing and hydraulic hoist testing.

PROJECT SHOWCASE

Selected Water Infrastructure Projects

Explore gate, hoist and debris-handling configurations for hydropower, pumped storage and reservoir projects.

Hydropower station Hydropower

Hydropower Gate & Hoist Systems

Gate and hoist configurations for intake isolation and spillway operation, with debris-handling equipment considered around water intake conditions.

Equipment Focus
Water control gates, gate hoists and intake trash handling equipment.
Pumped storage project Pumped Storage

Pumped Storage Intake & Outlet Gates

Gate systems for intake and outlet structures, with hoisting arrangements considered around operating head, gate loads and maintenance access.

Equipment Focus
Intake and outlet gates, gate hoists and maintenance isolation gates.
Reservoir and water control infrastructure Reservoir & Water Control

Reservoir Spillway & Flow Control Gates

Gates and operating equipment for controlled water release and flow regulation, with isolation provisions for inspection and maintenance.

Equipment Focus
Spillway gates, sluice gates and associated gate hoisting equipment.

APPLICATIONS & SOLUTIONS

Solutions for Water Infrastructure

Explore how Fuda’s gates, hoists and trash handling equipment support the operating and maintenance needs of different water infrastructure projects.

Hydropower station

Hydropower Stations

Gates and hoists for intake isolation and spillway operation, together with trash racks and cleaning equipment for debris management at water intakes.

  • Water Control Gates
  • Gate Hoists
  • Trash Racks & Cleaners
Pumped storage project

Pumped Storage Projects

Gate and hoist configurations for reservoir intake and outlet structures, with equipment selected around project-specific head, operating conditions and maintenance isolation requirements.

  • Intake & Outlet Gates
  • Gate Hoists
  • Maintenance Gates
Reservoir and water control infrastructure

Reservoirs & Water Control

Gates and operating equipment for controlled water release, flow regulation and maintenance isolation in reservoirs, river control structures and water supply projects.

  • Spillway Gates
  • Sluice Gates
  • Gate Hoists

BEFORE YOU INQUIRE

Frequently Asked Questions

Learn about Fuda's products, qualifications, quotation requirements and project support before discussing your water control project with our team.

What equipment does Fuda supply?

Fuda supplies gate operating equipment, including electric actuators, winch hoists and hydraulic hoists; flat gates, radial gates and maintenance gates; and ship lock gates. We provide complete hydromechanical equipment packages for reservoirs, hydropower plants, flood control and drainage systems, irrigation canals and inland navigation projects.

What information should I provide for a quotation?

Share the project application, equipment type, quantity and available drawings or specifications. For gates and hoists, useful details include gate dimensions, design head, operating method, lifting capacity and installation interfaces. Include any required standards, inspection requirements and target delivery date. If some details are unavailable, identify them for further discussion.

What qualifications and certifications does Fuda hold?

Fuda operates in accordance with ISO 9001 quality, ISO 14001 environmental and ISO 45001 occupational health and safety management systems. The company holds CE and classification society certifications, together with relevant Chinese qualifications and licenses covering hydromechanical steel structure fabrication and installation, anti-corrosion works, electronic and intelligent systems, and the manufacture of bridge and gantry cranes. Fuda is also recognized as a high-tech enterprise in China and a specialized and innovative enterprise in Jiangsu Province.

Can I send drawings for technical review?

You can share available drawings, equipment specifications and installation details as part of the technical discussion. Identify the drawing revision and whether the information is preliminary or approved. The review scope, design responsibilities and required approvals should be clarified before manufacturing.

What inspections and documents can be included?

Inspection and documentation requirements should be specified during quotation and confirmed in the contract. Items for discussion may include dimensional checks, material documentation, welding inspection, pre-assembly records and operating tests where applicable. Let Fuda know if your project requires customer witnessing or third-party inspection.

How is the delivery schedule determined?

The schedule depends on equipment size and quantity, technical complexity, drawing approvals, material availability and inspection requirements. Share your target date early so manufacturing and delivery arrangements can be discussed. The agreed schedule and delivery terms should be confirmed in the contract.

PROJECT INQUIRY

Discuss Your Project

Share your project application, equipment needs and available specifications with Fuda. Include gate dimensions, design head and operating requirements where applicable.

FUDA Form
Scroll to Top

PROJECT INQUIRY

Discuss Your Water Control Project

Tell us about your project and equipment requirements. Share available specifications or drawings to help us understand your needs.

  • Gate & Hoist Selection

    Discuss equipment options for your application.

  • Specifications & Customization

    Share dimensions, operating conditions, and technical requirements.

  • New Projects & Replacement

    Tell us about your new installation or existing equipment.

Have drawings or specifications?

Attach them to your inquiry. If details are still being developed, start with a brief project description.

Tell Us What You Need

Share your project details so we can better understand your requirements.

FUDA Form